Australia Wide Shipping

Stellmann Pu Pro Non Slip Concrete Floor CoatingsStellmann Pu Pro Non Slip Concrete Floor Coatings

Stellmann Aqualine PU Pro – 12KG Kit – Concrete Floor Coatings

$1,089.00$1,199.00 inc GST

UV-resistant, low VOC  concrete coating in various colours for interior/exterior use.

Clear
Quantity

STELLMANN AQUALINE PU PRO: ROBUST CONCRETE FLOOR & WALL COATING FOR SYDNEY

Stellmann Aqualine PU PRO is a premium, two-component coloured polyurethane coating system designed for both interior and exterior applications. This water-based, low-odour, and VOC-free formula delivers exceptional mechanical and chemical resistance, along with reliable UV protection. Its versatility extends from industrial halls and factories to stairs, commercial kitchens, passageways, garages, parking lots, and even concrete walls.

Achieve specific safety requirements by adding Stellmann Non-Slip Particles to Aqualine PU PRO to reach P3, P4, or P5 slip ratings.

KEY FEATURES

  • Premium quality, dual-component polyurethane coating
  • Water-based, low odour, and VOC-free – ideal for sensitive Sydney environments
  • Easy to apply with a long pot life, suitable for various project scales
  • Semi-gloss finish for a professional look
  • Designed for use with Stellmann Non-Slip Particles to meet diverse slip-resistance needs in Sydney workplaces and public spaces
  • UV-resistant and non-yellowing, maintaining its appearance under the Australian sun
  • Non-toxic, ensuring a safer application process
  • Can be applied to other surfaces like tiles with Stellmann Clear Primer for broader application

CORE BENEFITS

  • Convenient application by roller or airless sprayer
  • Primer often not required on concrete, saving time and cost
  • Water-dilutable, eliminating the need for harsh thinners
  • Suitable for a wide range of interior and exterior projects in Sydney
  • Helps surfaces comply with Australian safety standards AS 4586 and AS 4663
  • Non-flammable and non-hazardous for safer handling
  • Simple two-coat system (first diluted coat acts as primer)

PERFORMANCE IN AUSTRALIAN CONDITIONS

  • Weather: Excellent resistance to Sydney’s varied weather conditions
  • Salt: Unaffected by coastal salt spray and spills
  • Heat: Withstands high temperatures up to 120°C dry heat, common in industrial settings
  • Water: Resists rain and condensation, suitable for most exterior applications (avoid permanent immersion)
  • Solvent: Unaffected by splashes and spills of alcohols and similar solvents used in many industries
  • Abrasion: Suitable for low, medium, and high traffic areas, catering to diverse Sydney environments
  • Alkali & Acid: Avoid where frequent spills may occur

TYPICAL PROPERTIES ( Refer to Datasheet for more information)

  • Gloss Level: Semi-gloss
  • Thinner: Water (refer to dilution instructions)
  • Standard Colours: Light Grey (RAL 7035), Traffic Grey (RAL 7042), Anthracite Grey (RAL 7016), Traffic Yellow (RAL 1023), Traffic White (RAL 9016). Other colours available on request.
  • Mix Ratio: 5:1 (Part A : Part B by weight)
  • Components: 2
  • Pot life: Approximately 4 hours at 20°C – mix only what you need
  • Toxicity: No adverse health effects expected with proper handling (refer to Safety Data Sheet)
  • V.O.C. Level: 5 g/L
  • Shelf Life: 1 year in unopened container (protect from frost and direct sunlight)
  • Touch Dry: Around 60 minutes
  • Clean up: Water – simple and environmentally friendly
  • Application Method: Roller, conventional and airless sprayer (contact for spray application details)
  • Application Conditions: Ideal application between 15°C and 35°C air and substrate temperature 35°C, relative humidity75%, and concrete moisture under 10% (typical Sydney conditions should be monitored)
  • Coverage: One pack covers approximately 55-65 m²(two layers).

APPLICATION GUIDE FOR BEST RESULTS

SURFACE PREPARATION

New concrete in Sydney projects must cure for at least 28 days. Ensure the surface is thoroughly dry (less than 3% moisture). The concrete must be sound with a compressive strength of at least 25MPa and tensile strength of 1.5N/mm². Repair any non-structural cracks or holes. Clean the surface thoroughly, removing loose material, dirt, oil, grease, old coatings, and any contaminants. Mechanical grinding or abrasive blasting is recommended for new and old concrete. Ensure all traces of oil are removed. Protect the substrate from rising moisture. Consider a test area if unsure.

APPLICATION PROCEDURE & EQUIPMENT

Use PEKA Multitex Rollers. Apply Stellmann Aqualine PU PRO in two coats. The first, diluted coat acts as a primer; the second is the finish coat. A third coat is optional for high-traffic Sydney locations. Add Stellmann Non-Slip Particles only to the finish coat.

DILUTION RATES

Dilute first “prime” coat with 20% of water (mixture of part A and Part B) for new applications. Dilute second finish coat with 0-10% of water. For renovations (previously applied Stellmann Aqualine PU PRO projects) dilute first “primer” layer with 0-10% of water. Dilute the second layer with 0-10% of water.

MIXING INSTRUCTIONS (5:1 RATIO BY WEIGHT)

Multiply the weight of Part A by 0.2 to determine the required weight of Part B.

  • Stir Part A with a mechanical mixer at low speed for 5 minutes before use.
  • For smaller quantities, use a clean mixing cup and a precision electronic scale for accurate mixing ratios.
  • Mix Part A and B with a clean mechanical mixer for at least 5 minutes.
  • Do not use volume-based mixing cups as product density differs from water. Incorrect mixing voids warranty.
  • Refer to the detailed installation manual for comprehensive instructions.

APPLICATION TIPS

Avoid applying thick layers (wet film thickness above ~150μm) to prevent CO2 bubbles.

Prime Coat: Mix components at a 5:1 ratio and dilute with water as per instructions. Apply evenly to the surface. Allow to dry (within 24 hours) before the finish coat.

Finish Coat: Mix components at a 5:1 ratio. Add Stellmann Non-Slip particles (2-3% by weight) and dilute with water as instructed. Apply evenly in straight lines, finishing in the same direction. Avoid rolling back into curing areas to prevent uneven non-slip particle distribution. Do not exceed 3% non-slip particles by weight.

  • Use a mixing bucket/cup and an electronic precision scale.
  • Thoroughly stir Part A before mixing with Part B using separate, clean mixers.
  • Mix only the amount needed immediately. Securely close lids on unused product.
  • Practical coverage rates may vary based on application method, conditions, and surface roughness.

ACHIEVING SPECIFIC SLIP RATINGS

Add Stellmann Non-Slip Particles to the mixed Part A and Part B by weight using a precision electronic scale and mechanical mixer:

  • P3 Rating: Add 3% by weight
  • P4 Rating: Add 2.5% by weight
  • P5 Rating: Add 2.5% by weight

Example: You mixed 2.4kg of Stellmann Aqualin PU Pro (2kg of Part A and 0.4kg of Part B). You want to achieve a P3 slip-rating. Therefore, you multiply 0.02 x 2400 = 48. Add 48 grams of the Stellmann Non-Slip P3 Particles to the mixture.

CURING TIMES (at 20°C and 65% relative humidity, with good ventilation – typical Sydney conditions)

  • Dust dry: Approximately 2 hours
  • Re-coatable: 12 to 24 hours
  • Trafficable: Around 24 hours
  • Full cure: 3-7 days (depending on load, humidity, and temperature)

IMPORTANT PRECAUTIONS & LIMITATIONS

Always read the Data Sheet, Material Safety Data Sheet, and container labels. Avoid exterior application if rain is expected or if relative humidity is above 80% or likely to exceed it shortly after application. Coverage rates can vary. Suitable for concrete substrates.

Learn more about Sydney Industrial Coatings. Request a quote!

DOWNLOAD AQUALINE PU PRO TECHNICAL DATASHEET

 

Safety data sheet available upon request.

Reviews

There are no reviews yet.

Be the first to review “Stellmann Aqualine PU Pro – 12KG Kit – Concrete Floor Coatings”

Your email address will not be published. Required fields are marked *

Colour accuracy disclaimer: We have taken care to display the most accurate visuals of our products. However, we are not responsible for the colour accuracy of the device you are viewing our swatches on. These variations arise due to different computer monitors and devices (make, model and technology, as well as resolution, contrast and brightness control settings) in much the same way a scan will differ from an original image and a colour photocopy. Furthermore, coatings can exhibit variation in perceived colour depending on gloss level and application method. If you require a very specific colour match, please make your selection via actual swatches and colour boards available at our showroom.

Product Disclaimer: Ensure you read all product, technical and safety data sheets prior to application as liability falls on the applicator. All products must be applied in accordance with manufacturer’s recommended method.

You may also like…

Google Rating
4.9
Based on 101 reviews