Australia Wide Shipping

Flake Floor Coatings for Garages

Showing 9–9 of 9 results


Steps to achieve a successful Seamless Flake Flooring System


 

  1. Prepare the substrate thoroughly by diamond grinding or acid etching
    To achieve a successful floor coating system make sure your surface is free of dust, oil/grease, any loose particles or paint and moisture. If your floor is subject to rising dampness, you would need to apply a moisture barrier primer prior to applying your base coat | more info
  2. Repair cracks and imperfections using two-pack epoxy fillers
    Fill in all your cracks using a 2-pack epoxy filler, such as Sikadur 31 CFN. For larger cracks and spalls, use Sydney Industrial Coatings’ Epoxy Coving and Repair Kit. The patching mortar will need to be fully cured before it can be grinded or coated and this process usually takes a minimum of 6 – 8 hours.
  3. Apply epoxy primer to the floor and allow the coating to cure
    General curing time (at 20°C) is a minimum of 8 hours. This can vary further if solvent has been added to the epoxy.
  4. Return within 24 hours of applying the primer to remove rubbish and imperfections (by grinding down high sections and patching any low sections)
    This is an important step for if the coating is left uneven, this will show though your final coat. If this step if not completed within 30 – 36 hours (depending on temperature) of applying the previous coat, the floor will need to be scratched using an 80 grit sand paper.
  5. Apply an even coat of epoxy base coat and broadcast flake over the epoxy while the product is still wet and let it cure
    Wearing spike shoes is required to walk over the epoxy and broadcast the flake evenly however you must apply safety practices and be cautious of injury.
  6. Return the next day to vacuum/blow any loose flake and apply two clear top coats to achieve optimum results when sealing the flakes
    General curing time (at 20°C) is minimum 8 hours for each coat of clear. Depending on the top coat being used, ensure correct amount of product is applied to the floor | If the floor is subject to heavy solvent, fuel or chemical spillage consider applying a two-pack clear top coat instead of a single pack.
  7. Anti-slip media can be added to the topcoat to achieve a higher slip rating
    As you will be applying a clear coat, ensure the aluminium oxide is not a noticeable colour.
  8. On a freshly applied coating, the floor will be trafficable after a minimum of 24 hours and the recommended curing time before parking cars, boats, trailers or any other heavy objects, is a minimum 5 days after application of the final coat

 

 


 

 

SIC Mixed Flake Flooring Sample Card

 

 

SIC Natural Stone and Single Colour Epoxy Flake Flooring Sample Card From Sydney Industrial Coatings

 

 


Click here to view the PDF colour chart and select your Epoxy base coat


 


Click here to view our Epoxy Flake Flooring PDF Brochure


 

Google Rating
5.0
Based on 90 reviews
×
js_loader